January 2025 Update
Works are now well underway to convert the existing Westgate Roundabout into a Dutch Style Roundabout. The works form part of off-site highway improvements associated with phase 1 of West of Chichester (Whitehouse Farm) development. Following the grant of planning permission an Infrastructure Steering Group was set up to look at options for the existing roundabout and ways to improve pedestrian and cycle connectivity. The scheme provides dedicated cycle facilities and improved pedestrian connectivity while maintaining controlled flows of vehicles by reducing entry and circulatory speeds.
The use of Dutch roundabouts is new in this country so the layout may at first be unfamiliar to pedestrians, cyclists, and drivers. The developers have commissioned their designer Jubb to create a video explaining how to use the roundabout. To ensure traffic safety and to understand the priorities, please view the video link: https://www.youtube.com/watch?v=1Ptb2C-YUDM or you can watch the video below, which shows how to use the roundabout and ensure the safety of all users. The layout of the roundabout will give priority to people walking and cycling, whilst allowing drivers and cyclists to have a clear view of each other to ensure safe journeys for all. This will improve active travel for people on foot, bikes, and mobility aids.
Reduce your speed – Look Carefully – Protect Other Road Users
