Scheme benefits, costs and other impacts

    Why is the scheme required?

    The A24 between Worthing, Horsham and Dorking is an important route for access to jobs, education and services. It not only supports short-distance journeys near to the main settlements along the corridor but also longer-distance journeys across the area. The A24 also acts as an important alternative route to the M23/A23 and A3 corridors connecting south coast communities and rural parts of West Sussex and Surrey towards Gatwick Airport, the M25 and London.

    The majority of journeys along the corridor are currently made by private cars and public transport use is low. This results in congestion, especially during peak times, which makes bus journeys longer and services unreliable. It also encourages rat running on rural and residential roads away from the A24. 

    Congestion along the corridor is expected to worsen as new developments in the area come forward.

    There are limited pedestrian and cycle facilities along the A24 corridor, including a lack of suitable crossings for different types of users. The facilities that do exist do not meet the latest design guidance along many sections of the route.

    Road safety is also a problem, with some parts of the corridor having a high number and rate of collisions. Some of these have involved pedestrians and cyclists.

    These issues limit the attractiveness of using public transport, cycling and walking, while also restricting access across the A24 for different user groups. These issues could be addressed by improvements along the corridor.

    There are also environmental impacts associated with the A24 corridor including traffic emissions, noise, and wildlife disruption, while the A24 passes through protected landscapes including the South Downs National Park and the Surrey Hills National Landscape, and this needs to be taken into account as we develop any improvements.

    The West Sussex Transport Plan (opens in new window) and Surrey Transport Plan (opens in new window) set out how the councils intend to address a number of challenges, including climate change, congestion, public health and road safety through improvements to the transport network.

    Improvements to the A24 between Worthing, Horsham and Dorking would support the aims of both plans.

    What are the expected benefits of the proposals?

    The proposals aim to reduce congestion and improve road safety. The proposals also aim to make bus services more reliable and a more attractive transport choice, and provide improvements to make active travel a more comfortable, attractive, and safe option for journeys along and across the corridor. This could help reduce the number of car journeys, if more short distance trips are made by public transport, cycling and walking instead.

    How much will the proposals cost and how is it being funded?

    At this early stage a detailed cost estimate has not yet been produced. However, we expect costs to be in line with similar improvements being delivered around the country. Cost estimates will be prepared as part of the next design stage.

    It is currently expected that the improvements would be funded largely using developer contributions and grants from Government that are intended for transport improvement schemes. In order to access Government grant funding, it will be necessary to demonstrate in a business case that the proposals are deliverable and would provide good value for money.

    Will there be impacts on biodiversity/wildlife from the proposals?

    There is the potential for the transport corridor improvements to have impacts on grass verges, vegetation/trees and wildlife in various locations, as a result of highway widening and new lighting proposals. If impacts are likely to occur, they will be assessed in further detail as the designs develop, through detailed environmental assessment, including ecological impact assessments.

    We have a commitment to ensure that all major schemes consider ‘Biodiversity Net Gain’, so any impacts on biodiversity will need to be accompanied by compensatory biodiversity improvements that result in an overall measurable improvement in biodiversity elsewhere locally.

    Could the proposals affect any third-party land?

    At this early stage of scheme development we expect most of the proposed improvements could be constructed within the existing highway boundary or on land owned by the county councils. However, initial investigations have identified that some small areas of third-party land may be required to deliver some of the proposed measures, including at the following locations:

    • Land north of A24/A280 Findon Roundabout;
    • Land north-east of the A24 Beare Green Roundabout/Newdigate Road junction; and
    • Land south-east of the A2003 Flint Hill/Goodwyns Road junction.

    Further design work and checks on land ownership are required to understand whether additional land would be needed and, if so, how much. Should any proposals be taken forward where there is a requirement for third party land, they will be subject to further discussion with landowners at the next design stage.

Traffic proposals and maintenance

    Congestion is a really significant issue for the A24, why are road widening improvements not the main focus?

    Widening roads without also providing improvements to public transport, walking and cycling facilities has previously been shown to encourage more people to drive leading to more congestion in the long-term. The West Sussex Transport Plan (opens in new window) and Surrey Transport Plan (opens in new window) both identify the need for improvements to highways, public transport and active travel facilities to tackle congestion in a way that is sustainable over the long-term. 

    The proposed improvements include a range of measures to tackle congestion such as increasing the capacity of some junctions through traffic signals and additional approach lanes. However, we are also proposing improvements for other transport modes to provide better public transport, walking and cycling options for journeys where this is a realistic option.

    The proposed measures to support public transport include improving pedestrian and cycle access to bus stops and rail stations along the corridor, while bus journey times and reliability are expected to improve by measures to address traffic congestion at key junctions.

    By providing improved facilities for walking and cycling, we aim to make active travel a more comfortable, attractive, and safe option for journeys along and across the A24.

    Why are you not proposing a new road alignment between A22/A264 Great Daux Roundabout Horsham, and the A24 Clark's Green Roundabout Capel?

    To ease vehicle congestion along sections of the road we have considered building new stretches of road parallel to the existing A24. However, this would make it easier to drive and encourage traffic growth leading to more congestion in the long-term.

    initial work has also indicated that the high cost and significant environmental impacts of these options, mean that they are not anticipated to be deliverable. Therefore the measures which form part of this consultation focus on improvements to the existing alignment of the A24 corridor.

    Are there any proposals specifically aimed at improving the flow of traffic along the A24?

    The scheme includes targeted measures to increase junction capacities, including increasing the number of approach lanes and the introduction of traffic signals at key junctions to improve traffic flows at peak times. In addition to this, the scheme also includes measures to improve the attractiveness of alternatives to private vehicle use including public transport, walking and cycling which could help to improve conditions for traffic by encouraging modal shift.

    Are improvements at the A27/A24 Offington Roundabout, Worthing included?

    Improvements to the A27/A24 Offington Roundabout are outside the scope of this consultation as the A27 is part of the Strategic Road Network managed by National Highways.

    What are the county councils doing to address the condition of road surfaces across their areas?

    Information about both county council’s approaches to road maintenance is available at the following links: 

    Better Roads - West Sussex County Council (opens in new window)

    How we manage pothole repairs - Surrey County Council (opens in new window)

    It is currently expected that any measures that form part of the scheme will be largely funded using grant funding from Government and developer funding that cannot ordinarily be used for road maintenance.

    Will other maintenance works be carried out when improvements are constructed?

    The council’s will look for opportunities to coordinate other planned maintenance works when the improvements are constructed to take advantage of traffic management and minimise the impacts on road users. However, at this early stage of the project, it is too early to say which maintenance activities will be undertaken.

Walking, cycling and horse riding

    How will you ensure that any plans for pedestrian and cycle improvements are attractive for people to use?

    The designs will be developed in accordance with the latest guidance, including Active Travel England's Rural Design Guide (opens in new window) and Dft cycle design guidance (LTN 1/20) (opens in new window).

    In some locations available highway space for widened pedestrian and cycle facilities is constrained. At the next design stage further assessment will be required to understand the costs of resolving constraints impacting the width and set back of facilities from the A24 carriageway. This includes assessment of features such as trees, third party land, retaining walls and drainage infrastructure, in order to ensure measures remain deliverable and provide value for money.

    Will proposals link up to existing walking and cycling infrastructure?

    The proposals will be expected to link to existing facilities, such as footways, cycle tracks and public rights of way along the corridor, including by considering potential new crossing improvements that can provide a more joined-up network.

    What plans are there to improve the South Downs Way where it crosses the A24?

    The northern South Downs Way crossing of the A24 via The Street overbridge to Washington village is the promoted route for the South Downs Way, rather than the ‘at-grade’ southern crossing at the Glasby Lane/A24/Washington Bostal junction. The South Downs National Park Authority are currently undertaking a feasibility study of options to improve conditions on Washington Bostal for pedestrians, cyclists and equestrians to provide an improved South Downs Way route between The Street, Washington, and the Wiston Estate Car Park.

    Why aren't you proposing signal crossing facilities in Kingsfold Village and for the Findon Bypass?

    Surveys undertaken in these areas suggest that pedestrian demand is not currently high enough to justify the addition of signal-crossing facilities. In both locations uncontrolled crossing facilities are proposed with speed limit reductions to improve conditions for crossing the A24. 

    Why aren't any new crossing facilities included for equestrians where bridleways cross the A24?

    The provision of new, or replacement bridges and underpasses, including facilities that could accommodate equestrian users, has been explored. However, these options have not been taken forward due to their high costs, highway space constraints, and relatively low usage in predominantly rural locations along the A24.

    The potential to provide dedicated signal-controlled crossing facilities for equestrian use at locations along the A24 has also been considered in some locations. No specific proposals have been included in the package of measures for public consultation. This is because in some locations the junction interventions do not link to adjacent bridleways, or where they do, there are feasibility constraints related to lack of highway space, impacts of street lighting required for installing traffic signal-controlled crossings on dark skies or traffic impacts.

Public transport

    Are you considering any bus priority measures/improvements to services?

    The proposals include some improvements to pedestrian path and crossing access to bus stops at key locations along the corridor. It is expected that the proposals for introducing traffic signals at key junctions will also consider the need for traffic signals that prioritise late running buses at key junctions. This may support an increased frequency of bus services in the future.

    Why aren’t you re-instating bus stops along the A24 between Findon, Washington and Buck Barn area which were removed back in 2016?

    A number of bus stops were removed along these parts of the A24 in 2016 due to road safety concerns. The potential to reinstate these stops has been considered but there are no current proposals to do so because of a combination of the lack of highway space to accommodate bus laybys and/or because it has not been possible to identify deliverable crossing facilities to provide connectivity between north and southbound bus stops.

Road safety and speed limits

    What has been the impact of the introduction of average speed cameras on the A24 between Dorking and Beare Green?

    Average speed cameras were most recently installed along this section of the A24 in summer 2025 to encourage drivers to keep within the speed limit and help reduce the number and severity of collisions. Road safety improvements are assessed over several years, comparing collision records before and after a scheme is introduced. This helps distinguish longer-term changes from short-term fluctuations. It is therefore too early to draw firm conclusions about the cameras’ impact on collisions.

    What has been the impact of recent changes at A24/A283 Washington Roundabout?

    West Sussex County Council introduced a Local Safety Scheme for the A24/A283 Washington Roundabout in early 2026 to improve road safety performance at this junction. The scheme involved changes to the speed limit on the approaches to and around the roundabout, the introduction of visibility screens and partial concentric road markings. The package of measures was aimed to reduce the collision risk at this roundabout. Monitoring of the impact of the scheme at the roundabout is still ongoing.

    Are you proposing any further speed limit reductions on the A280 Long Furlong?

    The section of the A280 Long Furlong between A24 Findon roundabout and near to Tolmar Farm Road was reduced to 40mph in 2025 to address concerns about changes in elevation and bends on this road. There are currently no plans to reduce the speed limit on the remaining section of the A280 Long Furlong. The current speed limit is considered appropriate for the road environment and function. Analysis of historic collision data has not identified excessive speed as the primary contributory factor in collisions on this section. The county council will continue to monitor traffic speeds and safety on this route.

    Are there any proposals to improve road safety at the A24 Rock Road junction north of Washington?

    Previous study work has identified a northbound slip road at the A24 Rock Road junction as a potential improvement option. However, there are concerns about the business case for delivering this scheme as initial assessment has indicated that the scheme would be unlikely to provide good value for money, so this proposal is not proposed to be taken forward at this time.

    The consultation includes proposals to reduce the A24 speed limit past the Rock Road and Garden centre junctions from 70 to 60mph to improve road safety.

    Are any proposals being considered at the A24 Dial Post South/Grinders Lane junction to improve road safety?

    Previous study work has identified an option to introduce traffic signal controls, crossing and bus stop access improvements at the junction. However, initial assessments have indicated that the scheme would be unlikely to provide good value for money due to the high cost and impacts on road users, some of which would be negative, so these proposals are not being taken forward at this time.

    The consultation includes proposals to bring consistency to the A24 speed limit through the Basing Hill to Dial Post and B2135 Steyning Road area by applying a consistent 60mph speed limit to improve road safety.

    Are any proposals being considered at the B2135 Steyning Road junction to improve road safety?

    There is limited scope for significant changes at the A24/B2135 Steyning Road junction. Potential remedial measures are currently being investigated by the county council's road safety team to address the recent collision record at this junction, but not details are available as part of this consultation.

    What proposals are planned to improve road safety at the Bar Lane/A24 junction?

    Proposals are currently being progressed separate to this consultation to upgrade and improve signage, road markings and visibility at the Bar Lane, A24 southbound and A24 northbound junctions. Upgraded road markings have already been installed, and other measures are proposed for delivery in early 2027.

    In addition to these measures, this consultation includes a proposal to reduce the speed limit on the A24 northbound from 70 to 60mph in The Bar section from the current 50mph limit, past the bend and Bar Lane junction, to improve road safety. No speed limit changes are proposed in the southbound direction past Bar Lane junction which is currently 50mph. 

Development led proposals

    Why aren't there proposals for the A24 / Coles Lane junction near Capel?

    The scheme includes proposals for a safety barrier within the central reservation between Clark's Green and Beare Green Roundabouts. Beyond this the scheme includes no specific proposals for the A24 junction with Coles Lane. However, it is anticipated that the junction may be subject to future pedestrian and cycle crossing improvements associated with development site ‘Land south of Coles Lane’. Plans for a central reservation barrier would be coordinated with the development-led scheme in this location.

    Why aren't there proposals for the A24/B2237 Hop Oast Southwater junction?

    West Sussex County Council is in ongoing dialogue with Horsham District Council and the developer of the proposed strategic development site known as Land North West of Southwater regarding the delivery of a scheme to provide traffic signals and signal-controlled crossing facilities, and bus priority measures at this junction.

    Why aren't there proposals for the A24/A272 Buck Barn junction?

    A potential development site 'Wealdcross' has been promoted for inclusion in the emerging Horsham Local Plan. The site is to the north west of the junction and would involve development-led improvements to the junction. West Sussex County Council has not included proposals for this junction within this consultation until greater certainty is available about the associated development.

Next steps and other information

    When would you expect the improvements to be built?

    The next steps for the proposals will be informed by the outcomes of this consultation. Further design and consultation would be needed before any improvements could be constructed.  

    Construction would be subject to a business case, all relevant statutory processes (e.g. planning) and securing necessary funding for delivery. Therefore, it is not possible to confirm a delivery timescale at this stage. The timescales are likely to vary depending on the scale of any measures that are brought forward, however, for larger scale measures it is likely to be several years before any construction could commence.

    If the proposals go ahead, will there be road closures during construction?

    Before any construction on the proposals could start, Construction Management Plans would be developed to minimise the impact on the local community as much as possible. This will detail any necessary road closures or changes to access for public rights of way or footway and cycle path users, as well as diversion routes during construction. Further details of construction impacts will be made available at a future time.

    Why are technical drawings not published for all the schemes?

    Technical drawings have been published for the more complex scheme proposals for larger junction schemes. They have not been published for all of the schemes, as in most cases the route maps represent the same level of detail as on our original technical drawings.

    What are the next steps?

    Following the end of the consultation period, all responses will be analysed and used to help us decide the next steps for the proposals. If the proposals are taken forward, it will be necessary to undertake further design, consultation on specific interventions, complete all relevant statutory processes, and develop business cases. We will publish a consultation report in due course to present the results of the analysis and show how the feedback has been considered.

    I am a representative of an organisation or stakeholder group who has previously been engaged about potential proposals for the A24 corridor. Why is this consultation being carried out again?

    This public consultation is building on targeted engagement that we previously undertook with representatives of organisations along the A24 corridor which helped to understand some of the local issues, develop objectives and begin to flesh out the potential types of measures that could be brought forward. This is summarised in the A24 corridor stakeholder engagement summary (opens in new window) which was prepared ahead of our initial A24 public engagement in Autumn 2025 (opens in new window). Through this public consultation exercise we hope to understand the views of our wider communities on the proposed improvement measures.

    I want to speak to a member of the project team, what should I do?

    You can either email any comments or questions to the team at LTP@westsussex.gov.uk or you can telephone 01243 642105. If you are deaf or hard of hearing hard and have a BT Relay UK app (opens in new window) installed on your PC, laptop or smartphone, you can contact us on 18001 01243 642105.

    West Sussex County Council is coordinating this joint consultation covering the A24 from Worthing to Horsham and Dorking with Surrey County Council. Any queries specifically related to the section of the A24 in Surrey can be shared with colleagues at Surrey County Council to provide a response.